A resource for understanding all aspects of the construction process
A resource for ensuring that project intent is integral to the process
A resource for delivering maximum competition to the bid process
A resource for optimizing the quality and efficiency of the project
A resource for guaranteeing a cohesive project completion
We provide the management skills essential to finishing your project on time and on budget
Phase 1: Planning | Phase 2: Design | Phase 3: Procurement | Phase 4: Construction | Phase 5: Close Out |
|
---|---|---|---|---|---|
Project Management | Help establish project scope, budget, schedule, and the basic methods & procedures to be followed by the team | Review design documents for clarity, consistency, constructability
Provide value engineering analysis |
Develop and distribute bid documents
Select team members who are qualified & capable of meeting the quality standards and schedule |
Oversee methods & procedures to optimize the efficiency of the construction process | Communicate responsibilities connected with final payment, warranties, operation and maintenance manuals, as-builts, equipment commissioning and close-out to team members |
Cost Management | Estimate cost of construction and overall project | Ongoing input on cost comparisons of design schemes, recommendations to optimize project value | Analyze bids and verify the requirements of the construction documents | Verify vendor invoices, establish change order control system | Summarize total project costs in accordance with owner’s requirements |
Time Management | Participate in developing master schedule, Milestone schedule & associated responsibilities | Develop a pre-bid project schedule and identify major milestones | Review construction schedule with general contractor participation and obtain owner approval | Monitor actual construction compared with the schedule
Determine impact of changes/adds to schedule |
Coordinate construction schedule with the occupancy plan such as systems start up, punch lists, inspections, and furniture |
Quality Management | Understand the level of quality expected from the owner | Review constructability through design process | Develop instructions to bidder team members that include all requirements of the project to minimize change orders and misunderstandings | Ensure compliance to the construction documents
Monitor quality of workmanship |
Review close out documents such as operation and maintenance manuals, as-builts, testing for completeness and accuracy |
Contract Management & Administration | Develop procedures for recording and controlling the flow of submittals
Establish systems and procedures for communicating with owner and design professionals |
Assist in achieving a complete set of documents defining a cost effective project | Confirm bidders meet owner’s & landlord’s “conditions of construction”
Ensure contracts to vendors are in place and scope is well defined in contracts |
Secure proof of insurance
Relay communication procedures to vendors for chain of responsibility, submittal process. RFI’s, field orders, change orders, invoicing, ect. |
Document project close out for manuals, warranties, final permits, final payment, contract close out, etc. |